1985 Ford Mustang LX Convertible Project 5.8L HO

Price: - Item location: Wilmington, Delaware, United States
Description:

1985 Ford Mustang

Great project car ready and waiting for the right person to take over!I started this project several years ago and unfortunately must let someone else finish it due to the fact I simply don't have the time.
Most interior and body parts that you'll need to complete this project will be included with the car, except for certain incidentals like head lights or door handles and a few other misc. items. Also included are extra hard to find parts I scavenged off another convertible parts car...some of these parts you can not find other than in a salvage yard. The convertible top is beyond hope and will need to be replaced.
The following is a rundown of the work I have done to the car. Only serious inquires please. This could be an awesome one of kind project car or great parts car.
Engine: 5.8 H.O. motor out of va, rebuilt by me, with roughly 2500 miles, bored .030 over with Holley 600cfm carb., shorty BBK headers(new) and dual exhaust w/ h-pipe. Summit Racing electric fuel pump(new), stainless braided hose from pump to under-hood pressure regulator with gauge at carb(all new).
Transmission: Later model T5 - 5spd transmission with (new) clutch and pressure plate / throwout bearin, also has adjustable clutch cable quadrant(new).
Cooling: Standard 5.0 factory radiator with summit racing electric fan, temp switch and manual bypass switches installed.
Rear-end: 8 inch (origin unknown, 3.73 gears with posi unit. Has five lug conversion with five lug front spindles to match, with fresh gear lube and friction modifier.
Chassis: New stainless brake lines all around with new SSBC rear disc brake conversion.
Body: Replacement floor boards installed behind both front seats. Sub-frame connectors installed. Auto Meter gauges for Temp.,Oil Press.,Volt.,and Fuel (sending unit in tank included but still needs to be installed.) Custom body work done to front bumper cover, rear tail light fascia, and convertible top well area. Some sections will need to be finished.